FDOT: Widen TPK (SR91) CR470 To Lake/sumter C/l

roads & public workspre-construction · Lake County (unincorporated)

  1. Proposed
  2. Approved
  3. Building
  4. Done

Florida Department of Transportation project 435788-2: add lanes & reconstruction (Widen TPK (SR91) CR470 To Lake/sumter C/l). Status in FDOT's work program: pre-construction. Phases in the current work program: Design (Preliminary Engineering) FY2027.

The road work

Road wideningAdding travel lanes, which usually means rebuilding the road, drainage and intersections along the way.

0.55 miles

FDOT schedule (current five-year work program)

  1. Design · FY 2026/27 (Jul 2026–Jun 2027)Engineers draw the construction plans.

Street View shows the road as it looks today, at the middle of the work zone. Schedules can change; FDOT years are state fiscal years (July–June).

More in OkahumpkaGet monthly updates

Orange line: where the work is planned (S = start, E = end). Zoom in for 2025 county aerials.

Key facts

Type
roads & public works
Status
pre-construction
Government
Lake County (unincorporated)
Near
Okahumpka
Location
Near Okahumpka in unincorporated Lake County
Case / record
FDOT 435788-2

What this means

Road, drainage and utility projects funded by the state, county or a city. Dates and status come from the agency’s own project records.

Timeline & official records

  1. UndatedFDOT Five-Year Work Program: search item 435788-2
  2. UndatedFDOT Work Program Current (GIS)

How we placed this on the map

  • Road segment mapped from the FDOT work program GIS (0.55 miles)

Compiled by RLW Realty from public records; summary written from the record fields. Status can change between our updates; confirm with the agency before relying on it.